Location:  Nashville, TN Architect:  Artifice, LLC About:  This project includes a three-phase renovation and addition to the existing Hillsboro High School. The classroom, gymnasium, and cafeteria addition is a four-story conventionally reinforced, two-way concrete slab system. This addition spans over the top of the new gymnasium with...

Location:  Franklin, TN Architect:  b3Studio, Inc. About:  This project includes a 4-level two-way post-tensioned concrete parking structure extending below grade. There is also a, 18” thick two-way, post-tensioned podium slab level above the first-floor lobby and parking. From there, wood framing was utilized to provide an economical...

Location:  Franklin, TN Architect:  Bauer Askew Architecture, PLLC Photographer: Bauer Askew Architecture, PLLC (Rendering) and PWP Structural Engineers, LLC About:  PWPSE served as the engineer of record for this 4-level parking garage. The structural system includes a one-way cast-in-place post-tensioned concrete system. The one-way slab and beam system...